|
| | |||||||||||||||||
|
|
|
|
|
|
|
|
|
|
||||||||||
![]() |
| TOWERS
|
Prolyte has developed a new tower system to complete the range of MPT and ST towers. The new CT tower is designed for constructions with higher towers, which can resist higher loading. The new C52T tower can be built to a total height of 20m. The mast sections are available in several standard lengths (code: C52T-L…). |
![]() |
|
| C52T Tower | |||
Copyright © Prolyte Products
Group. All Rights Reserved. Specifications are subject to change without notice. Proprietary Notice. |