Prolyte 27/30

#Prolyte3030

This week 30-30 we’re back in the UK where we delivered a specially designed floor construction for Hammersmith’s legendary live music eventim Apollo.

Stage Electrics together with the technical team of Prolyte designed the platform from StageDex, which consists of over 400 standard 2 x 1 m decks and some very special custom decks to fill out the floor completely. This was the tricky part, the floor needed to fit the complete arena exactly. Offering not only stability but also an overall loading capacity of 750 kg/m2. Over 50 special decks were designed to fit the curves and angles of the building. Requiring exact drawings, as well as precision manufacturing, since tolerances were very narrow. The complete platform is built on adjustable stage legs to counteract the sloping floor.

image2-77.png

Prolyte brings something new every year. Founded in 1991 in Leek, Netherlands, Prolyte has quickly become famous around the world due to its in-house expertise and of being one step ahead of the competition with a new mentality and new energy: “Prolyte. Feel Fantastic.”